Road & Sidewalk Projects
The Village of Arlington Heights' Engineering Department oversees the street rehabilitation, reconstruction, resurfacing and sidewalk construction projects. Village streets selected for reconstruction are at a stage of deterioration where the curb and gutter is no longer functioning properly, there is failure of the street's subbase and the main part of the street is in poor condition. The Project Engineer for the Street Rehabilitation & Reconstruction Program is Briget Schwab.
Village streets selected for the resurfacing program are in the beginning stages of deterioration. This maintenance program is intended to extend the life of the street. Intermittent curb and sidewalk are removed and replaced, and the street is milled and resurfaced. The Project Engineer for the Street Resurfacing Program is Aldair Vargas.
The Public Works Department oversees asphalt edge grinding and resurfacing, which is an intermediate maintenance step to help prolong the life of streets that were not scheduled for reconstruction. For streets to qualify for this program, they must be in generally good condition throughout the center lane, but failing and breaking up near the curb and gutter line. Those failing portions of the street are then milled and resurfaced with hot mix asphalt (HMA). The Street Foreman for this program is Jake Francis.
Village streets selected for the resurfacing program are in the beginning stages of deterioration. This maintenance program is intended to extend the life of the street. Intermittent curb and sidewalk are removed and replaced, and the street is milled and resurfaced. The Project Engineer for the Street Resurfacing Program is Aldair Vargas.
The Public Works Department oversees asphalt edge grinding and resurfacing, which is an intermediate maintenance step to help prolong the life of streets that were not scheduled for reconstruction. For streets to qualify for this program, they must be in generally good condition throughout the center lane, but failing and breaking up near the curb and gutter line. Those failing portions of the street are then milled and resurfaced with hot mix asphalt (HMA). The Street Foreman for this program is Jake Francis.
Road & Sidewalk Project Information
For questions on the Sidewalk Program, please contact the Engineering Division at 847.368.5250.
Village streets selected for this program are in the beginning stages of deterioration. This maintenance program is intended to extend the life of the street. Intermittent curb and sidewalk are removed and replaced and the street is milled and resurfaced. Following is a list of streets slated for Resurfacing. Residents living on streets scheduled for resurfacing will be mailed construction notices in advance of any activity. Once work begins on a street, construction will take approximately 4-6 weeks to complete.
Village streets selected for this program are in the beginning stages of deterioration. This maintenance program is intended to extend the life of the street. Intermittent curb and sidewalk are removed and replaced and the street is milled and resurfaced. Following is a list of streets slated for Resurfacing. Residents living on streets scheduled for resurfacing will be mailed construction notices in advance of any activity. Once work begins on a street, construction will take approximately 4-6 weeks to complete.
Street Rehabilitation
Streets selected for rehabilitation are at a stage of deterioration where the curb and gutter is no longer functioning properly but the main part of the street is still in fair condition and no subbase failure is observed. All curb and gutter is removed and replaced, and a street patch is placed in front of the new curb and gutter. The entire street is then milled and resurfaced. This project may require grade changes and therefore, all driveway approaches are completely removed and replaced from the sidewalk to the curb. This program also includes intermittent sidewalk and drainage structure repair.
Street Reconstruction
Streets selected for reconstruction are at a stage of deterioration where the curb and gutter is no longer functioning properly, there is failure of the street's subbase and the main part of the street is in poor condition.
Streets listed for this program will have the entire street removed down to the subgrade, including curb and gutter. The curb and gutter is installed and the new street is replaced with asphalt. This project may also require grade changes, so the driveway approaches are completely removed and replaced from the sidewalk to the curb. Additionally, intermittent sidewalk will be removed and replaced and intermittent drainage structures will be repaired or replaced.
Street Widening
Streets are widened when the existing width does not meet the minimum Village standard, and there is enough right-of-way to complete the widening. New curb and gutter is installed, and the street is patched from the existing edge of pavement to the proposed curb and gutter. The remaining portion of the street is milled and resurfaced. Grade changes are necessary for this project. Consequently, driveway approaches are removed and replaced. This project also includes intermittent sidewalk and drainage structure repair.
Streets selected for rehabilitation are at a stage of deterioration where the curb and gutter is no longer functioning properly but the main part of the street is still in fair condition and no subbase failure is observed. All curb and gutter is removed and replaced, and a street patch is placed in front of the new curb and gutter. The entire street is then milled and resurfaced. This project may require grade changes and therefore, all driveway approaches are completely removed and replaced from the sidewalk to the curb. This program also includes intermittent sidewalk and drainage structure repair.
Street Reconstruction
Streets selected for reconstruction are at a stage of deterioration where the curb and gutter is no longer functioning properly, there is failure of the street's subbase and the main part of the street is in poor condition.
Streets listed for this program will have the entire street removed down to the subgrade, including curb and gutter. The curb and gutter is installed and the new street is replaced with asphalt. This project may also require grade changes, so the driveway approaches are completely removed and replaced from the sidewalk to the curb. Additionally, intermittent sidewalk will be removed and replaced and intermittent drainage structures will be repaired or replaced.
Street Widening
Streets are widened when the existing width does not meet the minimum Village standard, and there is enough right-of-way to complete the widening. New curb and gutter is installed, and the street is patched from the existing edge of pavement to the proposed curb and gutter. The remaining portion of the street is milled and resurfaced. Grade changes are necessary for this project. Consequently, driveway approaches are removed and replaced. This project also includes intermittent sidewalk and drainage structure repair.